Skip to content
Fertilization and Early Embryonic Development

Fertilization and Early Embryonic Development

By the end of this section, you will be able to:

  • Discuss how fertilization occurs
  • Explain how the embryo forms from the zygote
  • Discuss the role of cleavage and gastrulation in animal development

The process in which an organism develops from a single-celled zygote to a multi-cellular organism is complex and well-regulated. The early stages of embryonic development are also crucial for ensuring the fitness of the organism.

Fertilization

Fertilization, pictured below, is the process in which gametes (an egg and sperm) fuse to form a zygote. The egg and sperm each contain one set of chromosomes. To ensure that the offspring has only one complete diploid set of chromosomes, only one sperm must fuse with one egg. In mammals, the egg is protected by a layer of extracellular matrix consisting mainly of glycoproteins called the zona pellucida. When a sperm binds to the zona pellucida, a series of biochemical events, called the acrosomal reactions, take place. In placental mammals, the acrosome contains digestive enzymes that initiate the degradation of the glycoprotein matrix protecting the egg and allowing the sperm plasma membrane to fuse with the egg plasma membrane, as illustrated below. The fusion of these two membranes creates an opening through which the sperm nucleus is transferred into the ovum. The nuclear membranes of the egg and sperm break down and the two haploid genomes condense to form a diploid genome.

Two-panel image. Panel (a) is a black-and-white micrograph of a sperm's head touching the granular surface of a much larger egg, its long tail curving up and away, with a 10 µm scale bar at lower left. Panel (b) is a colour diagram of the egg's curved edge with several green sperm cells lined up along it, labeled with leader lines.
(a) Fertilization is the process in which sperm and egg fuse to form a zygote. (b) Acrosomal reactions help the sperm degrade the glycoprotein matrix protecting the egg and allow the sperm to transfer its nucleus. (credit: (b) modification of work by Mariana Ruiz Villareal; scale-bar data from Matt Russell)
Extended description

Panel (a): a micrograph on a black background shows a sperm’s oval head touching the textured tan surface of the much larger egg; its thin tail curves up and to the left, and a “10 µm” scale bar sits at the lower left corner. Panel (b) shows the curved edge of the egg in cross-section, labeled from outside in: zona pellucida (an orange band) and egg plasma membrane (a dotted line), with egg cytoplasm labeled inside the pale interior. Five green sperm cells are drawn along the egg’s outer curve: the topmost has already released a separate, arrow-shaped nucleus that touches the membrane, labeled sperm nucleus; the second sperm down still has an intact head and tail, with a small triangular acrosomal granule at its tip labeled acrosomal granule; three more sperm with intact heads and tails lie further along the curve. Two leader lines from the caption text “Changes in egg proteins prevent entry of other sperm” point to the membrane beside the fourth and fifth sperm.

To ensure that no more than one sperm fertilizes the egg, once the acrosomal reactions take place at one location of the egg membrane, the egg releases proteins in other locations to prevent other sperm from fusing with the egg. Ernest Everett Just, who was particularly skilled and knowledgeable in handling invertebrate eggs, demonstrated several mechanisms at work at different rates. The fast reaction included what Just called a “wave of negativity,” in which the membrane potential of the egg cell altered quickly. Then, the slow block involved changing the membrane structure itself. If these mechanisms fail, multiple sperm can fuse with the egg, resulting in polyspermy. The resulting embryo is not genetically viable and dies within a few days.

Cleavage and Blastula Stage

The development of multi-cellular organisms begins from a single-celled zygote, which undergoes rapid cell division to form the blastula. The rapid, multiple rounds of cell division are termed cleavage. Cleavage is illustrated below. After the cleavage has produced over 100 cells, the embryo is called a blastula. The blastula is usually a spherical layer of cells (the blastoderm) surrounding a fluid-filled or yolk-filled cavity (the blastocoel). Mammals at this stage form a structure called the blastocyst, characterized by an inner cell mass that is distinct from the surrounding blastula, shown below. During cleavage, the cells divide without an increase in mass; that is, one large single-celled zygote divides into multiple smaller cells. Each cell within the blastula is called a blastomere.

Two-panel diagram. Panel (a) shows six spheres of increasing cell number and decreasing individual cell size, from one undivided cell through two-, four-, eight-, and sixteen-cell stages to a larger, densely packed many-celled sphere. Panel (b) shows a similar hollow sphere with its outer cell layer and open, fluid-filled centre labeled.
(a) During cleavage, the zygote rapidly divides into multiple cells without increasing in size. (b) The cells rearrange themselves to form a hollow ball with a fluid-filled or yolk-filled cavity called the blastula.
Extended description

The group labeled (a) contains six spheres arranged in two rows, each with small purple dots marking nuclei: a single undivided cell; a cell split into two; a cell split into four; a cell split into about eight; a small, densely packed cluster of about sixteen cells; and, beside them, a larger, more evenly packed sphere of many small cells with no visible cavity. The sphere labeled (b), further right, looks similar but hollow, with a shaded, open centre; leader lines label the outer ring of cells blastoderm and the fluid-filled centre blastocoel.

Cleavage can take place in two ways: holoblastic (total) cleavage or meroblastic (partial) cleavage. The type of cleavage depends on the amount of yolk in the eggs. In placental mammals (including humans) where nourishment is provided by the parent’s body, the eggs have a very small amount of yolk and undergo holoblastic cleavage. Other species, such as birds, with a lot of yolk in the egg to nourish the embryo during development, undergo meroblastic cleavage.

In mammals, the blastula forms the blastocyst in the next stage of development. Here the cells in the blastula arrange themselves in two layers: the inner cell mass, and an outer layer called the trophoblast. The inner cell mass is also known as the embryoblast and this mass of cells will go on to form the embryo. At this stage of development, illustrated below, the inner cell mass consists of embryonic stem cells that will differentiate into the different cell types needed by the organism. The trophoblast will contribute to the placenta and nourish the embryo.

Diagram of a hollow sphere of cells with a smaller cluster of cells bunched against one interior side, its three parts labeled with leader lines.
The rearrangement of the cells in the mammalian blastula to two layers—the inner cell mass and the trophoblast—results in the formation of the blastocyst.
Extended description

Three leader lines label the sphere: one from blastocoel points to the open, shaded space inside the ring of outer cells; one from trophoblast points to the outer ring of cells forming the sphere’s wall; one from inner cell mass points to the separate cluster of cells bunched against the inside of that wall on one side.

Link to Learning

Visit the Virtual Human Embryo project at the Endowment for Human Development site to step through an interactive that shows the stages of embryo development, including micrographs and rotating 3-D images.

Gastrulation

The typical blastula is a ball of cells. The next stage in embryonic development is the formation of the body plan. The cells in the blastula rearrange themselves spatially to form three layers of cells. This process is called gastrulation. During gastrulation, the blastula folds upon itself to form the three layers of cells. Each of these layers is called a germ layer and each germ layer differentiates into different organ systems.

The three germ layers, shown below, are the endoderm, the ectoderm, and the mesoderm. The ectoderm gives rise to the nervous system and the epidermis. The mesoderm gives rise to the muscle cells and connective tissue in the body. The endoderm gives rise to columnar cells found in the digestive system and many internal organs.

Diagram of eleven small cell images grouped into three labeled, coloured panels — endoderm, mesoderm, and ectoderm — each panel's cell images pointed to by arrows from a bracketed heading above it.
The three germ layers give rise to different cell types in the animal body. (credit: modification of work by NIH, NCBI)
Extended description

Three bracketed headings sit above three coloured panels, each with arrows pointing down into its panel. Endoderm (internal layer) points into a yellow panel of three cell images labeled, left to right, lung cells (alveolar cell), thyroid cells, and digestive cells (pancreatic cell). Mesoderm (middle layer) points into a green panel of five cell images labeled cardiac muscle cells, skeletal muscle cells, tubule cells of the kidney, red blood cells, and smooth muscle cells (in gut). Ectoderm (external layer) points into a blue panel of three cell images labeled skin cells of epidermis, neuron on brain, and pigment cells.

Everyday Connection. Are Designer Babies in Our Future?

Black-and-white line drawing of a large oak tree labeled Eugenics across its trunk, with the words Eugenics is the self direction on one side and of human evolution on the other; its roots are labeled with fields of study such as biology, genetics, psychology, anthropology, history, statistics, medicine, and sociology, and text beneath the tree reads Like a tree, eugenics draws its materials from many sources and organizes them into an harmonious entity.
This logo from the Second International Eugenics Conference in New York City in September of 1921 shows how eugenics attempted to merge several fields of study with the goal of producing a genetically superior human race.

If you could prevent your child from getting a devastating genetic disease, would you do it? Would you select the sex of your child or select for their attractiveness, strength, or intelligence? How far would you go to maximize the possibility of resistance to disease? The genetic engineering of a human child, the production of “designer babies” with desirable phenotypic characteristics, was once a topic restricted to science fiction. This is the case no longer: science fiction is now overlapping into science fact. Many phenotypic choices for offspring are already available, with many more likely to be possible in the not too distant future. Which traits should be selected and how they should be selected are topics of much debate within the worldwide medical community. The ethical and moral line is not always clear or agreed upon, and some fear that modern reproductive technologies could lead to a new form of eugenics.

Eugenics is the use of information and technology from a variety of sources to improve the genetic makeup of the human race. The goal of creating genetically superior humans was quite prevalent (although controversial) in several countries during the early 20th century, but fell into disrepute when Nazi Germany developed an extensive eugenics program in the 1930s and 40s. The Nazis forcibly sterilized hundreds of thousands of the so-called “unfit” and killed tens of thousands of people with disabilities who resided in institutions, both as part of a systematic program to develop a genetically superior race of Germans known as Aryans. Ever since, eugenic ideas have not been as publicly expressed, but there are still those who promote them.

Efforts have been made in the past to control traits in human children using donated sperm from people with desired traits. In fact, eugenicist Robert Klark Graham established a sperm bank in 1980 that included samples exclusively from donors with high IQs. The “genius” sperm bank failed to capture the public’s imagination and the operation closed in 1999.

In more recent times, the procedure known as prenatal genetic diagnosis (PGD) has been developed. PGD involves the screening of human embryos as part of the process of in vitro fertilization, during which embryos are conceived and grown outside the mother’s body for some period of time before they are implanted. The term PGD usually refers to both the diagnosis, selection, and the implantation of the selected embryos.

In the least controversial use of PGD, embryos are tested for the presence of alleles which cause genetic diseases such as sickle cell disease, muscular dystrophy, and hemophilia, in which a single disease-causing allele or pair of alleles has been identified. By excluding embryos containing these alleles from implantation into the mother, the disease is prevented, and the unused embryos are either donated to science or discarded. There are relatively few in the worldwide medical community that question the ethics of this type of procedure, which allows individuals scared to have children because of the alleles they carry to do so successfully. The major limitation to this procedure is its expense. Not usually covered by medical insurance and thus out of reach financially for most people, only a very small percentage of all live births use such complicated methodologies. Yet, even in cases like these where the ethical issues may seem to be clear-cut, not everyone agrees with the morality of these types of procedures. For example, to those who take the position that human life begins at conception, the discarding of unused embryos, a necessary result of PGD, is unacceptable under any circumstances.

A murkier ethical situation is found in the selection of a child’s sex, which is easily performed by PGD. Currently, countries such as Great Britain have banned the selection of a child’s sex for reasons other than preventing sex-linked diseases. Other countries allow the procedure for “family balancing”, based on the desire of some parents to have at least one child of each sex. Still others, including the United States, have taken a scattershot approach to regulating these practices, essentially leaving it to the individual practicing physician to decide which practices are acceptable and which are not.

Even murkier are rare instances of people with disabilities who select embryos via PGD to ensure that they share their disability. These parents usually cite many positive aspects of their disabilities and associated culture as reasons for their choice, which they see as their moral right. To others, to purposely cause a disability in a child violates the basic medical principle of Primum non nocere, “first, do no harm.” This procedure, although not illegal in most countries, demonstrates the complexity of ethical issues associated with choosing genetic traits in offspring.

Where could this process lead? Will this technology become more affordable and how should it be used? With the ability of technology to progress rapidly and unpredictably, a lack of definitive guidelines for the use of reproductive technologies before they arise might make it difficult for legislators to keep pace once they are in fact realized, assuming the process needs any government regulation at all. Other bioethicists argue that we should only deal with technologies that exist now, and not in some uncertain future. They argue that these types of procedures will always be expensive and rare, so the fears of eugenics and “master” races are unfounded and overstated. The debate continues.

Summary

The early stages of embryonic development begin with fertilization. The process of fertilization is tightly controlled to ensure that only one sperm fuses with one egg. After fertilization, the zygote undergoes cleavage to form the blastula. The blastula, which in some species is a hollow ball of cells, undergoes a process called gastrulation, in which the three germ layers form. The ectoderm gives rise to the nervous system and the epidermal skin cells, the mesoderm gives rise to the muscle cells and connective tissue in the body, and the endoderm gives rise to columnar cells and internal organs.

Key terms

  • acrosomal reaction — series of biochemical reactions that the sperm uses to break through the zona pellucida
  • blastocyst — structure formed when cells in the mammalian blastula separate into an inner and outer layer
  • gastrulation — process in which the blastula folds over itself to form the three germ layers
  • holoblastic — complete cleavage; takes place in cells with a small amount of yolk
  • inner cell mass — inner layer of cells in the blastocyst
  • meroblastic — partial cleavage; takes place in cells with a large amount of yolk
  • polyspermy — condition in which one egg is fertilized by multiple sperm
  • trophoblast — outer layer of cells in the blastocyst
  • zona pellucida — protective layer of glycoproteins on the mammalian egg

Practice

Discuss how fertilization occurs

What do you think would happen if multiple sperm fused with one egg?

Show model answer
Multiple sperm can fuse with the egg, resulting in polyspermy. The resulting embryo is not genetically viable and dies within a few days.

Did your answer mention:

The protective layer of glycoproteins that surrounds the mammalian egg is called the ________.

The series of biochemical reactions that let a sperm break through that protective egg layer is called the ________.

Explain how the embryo forms from the zygote

During cleavage, the mass of cells:

The structure formed when cells in the mammalian blastula separate into an inner and outer layer is called the ________.

The layer of cells inside the blastocyst that will differentiate into the embryo’s stem cells is called the ________.

The outer layer of cells in the blastocyst, which will contribute to the placenta, is called the ________.

Discuss the role of cleavage and gastrulation in animal development

Which of the following is false?

Why do mammalian eggs have a small concentration of yolk, while bird and reptile eggs have a large concentration of yolk?

Show model answer
Mammalian eggs do not need a lot of yolk because the developing fetus obtains nutrients from the mother. Other species, in which the fetus develops outside of the mother’s body, such as occurs with birds, require a lot of yolk in the egg to nourish the embryo during development.

Did your answer mention:

The process in which the blastula folds over itself to form the three germ layers is called ________.

Complete cleavage, which takes place in cells with a small amount of yolk, is called ________ cleavage.

Partial cleavage, which takes place in cells with a large amount of yolk, is called ________ cleavage.


This section is adapted from Biology 2e, Section 43.6: Fertilization and Early Embryonic Development by Mary Ann Clark, Jung Choi, Matthew Douglas, and OpenStax, © OpenStax, licensed under CC BY-NC-SA 4.0. Access the original for free at openstax.org. Changes: figures re-encoded as WebP; three figures re-kinded from the manifest’s file-extension “photo” guess to “diagram” (Figure_43_05_01ab is a two-panel image whose second panel is a labeled line diagram, not a photograph throughout; Figure_43_05_04 and Figure_43_05_05 are a composited labeled chart and a line-drawing illustration, not captured photographs); a longdesc added to every diagram whose printed labels are not carried by its one-line caption — the fertilization cross-section, the cleavage/blastula panels, the labeled blastocyst, and the germ-layer derivatives chart — transcribing each drawing’s own labels and leader-line counts in reading order; in-text pointers to figures (“Figure 43.23” through “Figure 43.26”) replaced with “shown below,” “pictured below,” or “illustrated below,” since Hugo does not number figures; the interactive note rendered as a Link to Learning callout, keeping the module’s own openstax.org/l/human_embryo redirect URL; the everyday note rendered as an Everyday Connection callout with its bold name and italic title, its own figure kept inside it; the two Review Questions and two Critical Thinking Questions adapted into the closing interactive Practice block (multiple choice and self-check respectively); rubric checkpoints added to each self-check, decomposing its model answer (the source solution) into check-off clauses with no new claims; eight key-term recall items added from the glossary (zona pellucida, acrosomal reaction, blastocyst, inner cell mass, trophoblast, gastrulation, holoblastic, meroblastic — eight items across three groups), covering eight of the section’s nine glossary terms.